For engineering firms
Several levels, several panels, cable lengths measured along the walls: the calculations stay correct when the plan changes.
Calculations on the actual length
Cables are routed along the walls and recalculated when a point or wall moves. A length entered by hand is never overwritten.
Balanced phases
Load per circuit and per phase, alert on imbalance and a suggested redistribution.
Sub-panels
A main panel, sub-panels, each with its own single-line diagram.
Exchange
DXF export of plans, A3 PDF, .djx project file.
Disjoncto helps design the installation. The official inspection is still carried out by an accredited body.